Rehabilitation of 1400mm/1600mm sewer pipe

Client: Gawar Constructions/ NHAI
Location: NH8, IFFCO CHOWK, Gurugram

There were frequent settlements in the pipe due to corrosion in the crown /loss of structural strength and construction of new flyover /bridge over the line. This area is extremely crucial as it carries heavy traffic towards the nearby airport

Condition of the sewer when we started working

Condition after CIPP Lining

Desilting of existing master sewer line including plugging and diversion of flow, providing and installing of Cured –in – Place Pipe liner (CIPP) of existing deteriorated master sewer line for size 600mm, 700mm and 800mm i/d along dividing road of Sector – 21/22, 22/23 and 23/23A, Gurugram and all other works contingent thereto

Client: GMDA

Location: Sec- 21/22/23, Gurugram

Here the crown was totally corroded leading to structural loss of sewer and frequent settlement. Artificial supports were first inserted in to the existing pipe which was almost about the collapse (as shown in the picture) to make the CIPP process easier and more durable

 

Condition of the sewer revealed after desilting/cleaning

Condition after CIPP Lining

Rehabilitation of 1560mm diameter sewer pipe
Client: UPJN
Location: Carbon Factory, Ghaziabad

Bricks exposed as mortar was totally missing due to corrosion activities. This lead to both structural loss and fear of the pipe collapsing any moment

Pictures of two different locations after desilting/cleaning

Condition after CIPP Lining

Rehabilitation of Chandni Chowk Sewer in Delhi Client : Delhi Jal Board
Location: Chandni Chowk Market

Onsite India was awarded the work of rehabilitation of the Chandni Chowk sewer line. Chandni Chowk suffered from huge water logging due to its old sewers laid during the British times and internally the 98 % silted sewer also showed infiltration problems. The entire network of 1200 meters was an egg shaped brick barrel with varying sizes from downstream to the upstream. This project was a part of Delhi Government’s flagship program of redevelopment of Chandni Chowk. The project was completed successfully and on time despite the lockdown due to the covid situation

Condition of the sewer revealed after desilting/cleaning

Condition after CIPP Lining

Rehabilitation of sewer at Jodhpur
Client : Rajasthan Urban Infrastructure Development Program (RUIDP)
Location: Bhagath ki kothi

The city of Jodhpur is important in Indian history. Not only so Jodhpur earns a lot of revenue in terms of tourism. G20 was organized in India in 2023 and Jodhpur was one of the venues. Rain created huge potholes in Jodhpur and the crown of the sewer being totally damaged there was no support underneath the road. We had to finish the rehabilitation at the Bhagath Ki Kothi stretch as soon as possible to be followed by a shut down of traffic on that road for dignitary movement

Condition of the sewer revealed after desilting/cleaning