Home > Case studies

Case studies

Real-world results from complex Pipe rehabilitation challenges across India.

Real Work, Real Results

Success Stories in Action

Explore how Pipe Care Services’s trenchless technology and expert execution have solved major infrastructure issues — from heritage zones to high-traffic corridors. Our case studies demonstrate precision, speed, and sustainability in action, tailored to diverse site demands.

5-3

Rehabilitation of 1400mm/1600mm Sewer Pipe

4

CIPP: An Answer to Infiltration/Exfiltration

Before

After

Rehabilitation of 1400mm/1600mm Sewer Pipe

  • Client: Gawar Constructions / NHAI
  • Location: NH8, IFFCO Chowk, Gurugram
  • Pipe Size: 1400mm / 1600mm
  • Result: Settlements eliminated, pipe structurally restored under heavy traffic corridor.
  •  

Before

After

Rehabilitation of
600mm–800mm Sewer Line

  • Client: GMDA
  • Location: Sector 21/22/23, Gurugram
  • Pipe Size: 600mm, 700mm, 800mm
  • Result: Crown corrosion resolved, CIPP lining extended pipe life significantly.

Before

After

Rehabilitation of
1560mm Sewer Pipe

  • Client: UP Jal Nigam
  • Location: Carbon Factory, Ghaziabad
  • Pipe Size: 1560mm
  • Result: Structural loss reversed, brick barrel reinforced with CIPP.

Before

After

Rehabilitation of
Chandni Chowk Sewer

  • Client: Delhi Jal Board
  • Location: Chandni Chowk Market, Delhi
  • Pipe Size: Egg-shaped 1200m brick barrel (varied sizes)
  • Result: 98% silted line fully restored, waterlogging eliminated.

Before

After

Sewer Rehabilitation – Jodhpur (G20 Venue)

  • Client: RUIDP
  • Location: Bhagath ki Kothi, Jodhpur
  • Pipe Size: Large brick barrel sewer
  • Result: Emergency repair completed before G20 event, preventing road collapse.

Before

After

Rampur Sewer Rehabilitation

  • Client: UP Jal Nigam
  • Location: Rampur, Uttar Pradesh
  • Pipe Size: 700mm RCC NP3, depth 4–5m
  • Result: Emergency infiltration control, CIPP installed despite heavy groundwater.

Before

After

Georgetown & Bairahana, Allahabad

  • Client: UP Jal Nigam
  • Location: Prayagraj (Allahabad), Uttar Pradesh
  • Pipe Size: Main trunk sewers
  • Result: 100% silted, calcium-blocked sewers rehabilitated before Kumbh Mela.

Before

After

Chandni Chowk (British-Era Drain Discovery)

  • Client: Delhi Jal Board
  • Location: Red Fort to Fatehpuri, Old Delhi
  • Pipe Size: 1650mm brick barrel (British-era)
  • Result: Historic line restored with CIPP, reducing flooding in Old Delhi.

Before

After

N.M. Joshi Marg, Mumbai

  • Client: BMC (Brihan Mumbai Municipal Corporation)
  • Location: Mumbai
  • Pipe Size: Large sewer line, multi-diameter
  • Result: Collapsed section stabilized, infiltration controlled, flooding mitigated.